Search any Make, Model, Year

2022 BMW M3

Sold out
$69,998STOCK #: 52682B

Phone Number: 925-808-4118

Odometer: 40,978 ml
slide-1

SPECIFICATIONS OF THIS BMW M3

  • PRICE:$69,998
  • BODY STYLE:4D Sedan / Sedan
  • ODOMETER:40,978 MI
  • ENGINE:V6 3L
  • TRANSMISSION:8-Speed Automatic Steptronic
  • TRIM:Competition
  • DRIVE TRAIN:RWD
  • FUEL TYPE:Gasoline
  • COLOR:Black Sapphire Metallic
  • DOORS:4
  • MPG CITY:16

Description of BMW M3

Priced below KBB Fair Purchase Price!***NAVIGATION / GPS***, ***ACTIVE BLIND SPOT MONITOR***, ***COLLISION WARNING SYSTEM***, ***PARKING SENSORS***, PREMUIM SOUND, BACKUP CAMERA, POWER DRIVER SEAT, POWER PASSANGER SEAT, PUSH BUTTON IGNITION, KEYLESS ENTRY, HEATED SEAT, PREMIUM WHEELS, ONE OWNER CARFAX.WE WANT YOUR TRADE IN! We offer you a guaranteed value online for your valuable trade in by Kelly Blue Book Instant Cash Offer! Visit our website at [link] for a free guaranteed value on your vehicle.CARFAX One-Owner.TO SEE MORE QUALITY VEHICLES LIKE THIS ONE RIGHT HERE CLICK [link]

EQUIPMENT AND OPTIONS OF THIS BMW M3

  • Navigation System
  • M Driver's Package
  • Parking Assistance Package
  • 16 Speakers
  • AM/FM radio: SiriusXM with 360L
  • harman/kardon Surround Sound System
  • harman/kardon Speakers
  • Radio data system
  • Radio: AM/FM Audio System
  • SiriusXM w/360L
  • Air Conditioning
  • Automatic temperature control
  • Front dual zone A/C
  • Rear air conditioning
  • Rear window defroster
  • Lumbar Support
  • Memory seat
  • Power driver seat
  • Power steering
  • Power windows
  • Remote keyless entry
  • Steering wheel mounted audio controls
  • Adaptive suspension
  • Four wheel independent suspension
  • Speed-sensing steering
  • Traction control
  • 4-Wheel Disc Brakes
  • ABS brakes
  • Dual front impact airbags
  • Dual front side impact airbags
  • Emergency communication system: BMW Assist eCall
  • Front anti-roll bar
  • Knee airbag
  • Low tire pressure warning
  • Occupant sensing airbag
  • Overhead airbag
  • Rear anti-roll bar
  • Brake assist
  • Electronic Stability Control
  • Exterior Parking Camera Rear
  • Auto High-beam Headlights
  • Delay-off headlights
  • Fully automatic headlights
  • Panic alarm
  • Security system
  • Speed control
  • Auto-dimming door mirrors
  • Bumpers: body-color
  • Heated door mirrors
  • Parking Assistant Plus
  • Power door mirrors
  • Spoiler
  • Turn signal indicator mirrors
  • Apple CarPlay & Android Auto Compatibility
  • Auto-dimming Rear-View mirror
  • BMW Assist eCall
  • BMW TeleServices
  • Compass
  • ConnectedDrive Services
  • Drive Recorder
  • Driver door bin
  • Driver vanity mirror
  • Enhanced Bluetooth
  • Front reading lights
  • Garage door transmitter
  • Illuminated entry
  • Leather Shift Knob
  • Live Cockpit Pro w/Navigation
  • Outside temperature display
  • Passenger vanity mirror
  • Rear reading lights
  • Sport steering wheel
  • Tachometer
  • Telescoping steering wheel
  • Tilt steering wheel
  • Trip computer
  • Extended Merino Leather Seat Upholstery
  • Front Bucket Seats
  • Front Center Armrest
  • Heated Front Seats
  • Heated front seats
  • M Sport Seats
  • Power Front Seats
  • Power passenger seat
  • Split folding rear seat
  • Passenger door bin
  • Alloy wheels
  • Wheels: 19"x9.5" Fr.&20"x10.5"Rr. M Bi-color (1T8)
  • Rain sensing wipers
  • Speed-Sensitive Wipers
  • Variably intermittent wipers
  • ***NAVIGATION / GPS***
  • ***ACTIVE BLIND SPOT MONITOR***
  • ***COLLISION WARNING SYSTEM***
  • ***PARKING SENSORS***
  • PREMUIM SOUND
  • BACKUP CAMERA
  • POWER DRIVER SEAT
  • POWER PASSANGER SEAT
  • PUSH BUTTON IGNITION
  • KEYLESS ENTRY
  • HEATED SEAT
  • PREMIUM WHEELS
  • ONE OWNER CARFAX