Search any Make, Model, Year

2021 BMW M3

$61,135STOCK #: PW2564

Phone Number: 304-722-4900

Odometer: 34,641 ml
slide-1

SPECIFICATIONS OF THIS BMW M3

  • PRICE:$61,135
  • BODY STYLE:4D Sedan / Sedan
  • ODOMETER:34,641 MI
  • ENGINE:V6 3L
  • TRANSMISSION:6-Speed Manual
  • TRIM:Base
  • DRIVE TRAIN:RWD
  • FUEL TYPE:Gasoline
  • COLOR:Brooklyn Gray Metallic
  • DOORS:4
  • MPG CITY:16

Description of BMW M3

BMW PRE-OWNED, SIRIUSXM APPLE CARPLAY, ANDROID AUTO, MOBILITY KIT, CONFORT ACCESS KEYLESS ENTRY, AUTO DIMMING MIRRORS, STORAGE PACKAGE, ACTIVE DRIVING ASSISTANT, HARMAN KARDON SURROUND SOUND, CONNECTEDDRIVE SERVICE, CONNECTED PACKAGE PRO LIMITED TERM, LIVE COCKPIT PRO INCL NAV, DAYTIME DRIVING LIGHTS, MANUAL TRANSMISSION PARKING ASSISTANCE PACKAGE, PARKING ASSISTANT PLUS, DRIVE RECORDER

EQUIPMENT AND OPTIONS OF THIS BMW M3

  • Navigation System
  • Parking Assistance Package
  • 16 Speakers
  • AM/FM radio: SiriusXM with 360L
  • harman/kardon Surround Sound System
  • harman/kardon Speakers
  • Radio data system
  • Radio: AM/FM Audio System
  • SiriusXM w/360L
  • Air Conditioning
  • Automatic temperature control
  • Front dual zone A/C
  • Rear air conditioning
  • Rear window defroster
  • Lumbar Support
  • Memory seat
  • Power driver seat
  • Power steering
  • Power windows
  • Remote keyless entry
  • Steering wheel mounted audio controls
  • Adaptive suspension
  • Four wheel independent suspension
  • Speed-sensing steering
  • Traction control
  • 4-Wheel Disc Brakes
  • ABS brakes
  • Dual front impact airbags
  • Dual front side impact airbags
  • Emergency communication system: BMW Assist eCall
  • Front anti-roll bar
  • Knee airbag
  • Low tire pressure warning
  • Occupant sensing airbag
  • Overhead airbag
  • Rear anti-roll bar
  • Brake assist
  • Electronic Stability Control
  • Exterior Parking Camera Rear
  • Auto High-beam Headlights
  • Delay-off headlights
  • Fully automatic headlights
  • Panic alarm
  • Security system
  • Speed control
  • Auto-dimming door mirrors
  • Bumpers: body-color
  • Heated door mirrors
  • Parking Assistant Plus
  • Power door mirrors
  • Spoiler
  • Turn signal indicator mirrors
  • Apple CarPlay & Android Auto Compatibility
  • Auto-dimming Rear-View mirror
  • BMW Assist eCall
  • BMW TeleServices
  • Compass
  • ConnectedDrive Services
  • Drive Recorder
  • Driver door bin
  • Driver vanity mirror
  • Front reading lights
  • Garage door transmitter
  • Illuminated entry
  • Leather Shift Knob
  • Live Cockpit Pro w/Navigation
  • Outside temperature display
  • Passenger vanity mirror
  • Rear reading lights
  • Sport steering wheel
  • Tachometer
  • Telescoping steering wheel
  • Tilt steering wheel
  • Trip computer
  • Extended Merino Leather Seat Upholstery
  • Front Bucket Seats
  • Front Center Armrest
  • Heated Front Seats
  • Heated front seats
  • M Sport Seats
  • Power Front Seats
  • Power passenger seat
  • Split folding rear seat
  • Passenger door bin
  • Alloy wheels
  • Wheels: 18"x9.5" Fr. & 19"x10.5"Rr. M Orbit Grey
  • Rain sensing wipers
  • Speed-Sensitive Wipers
  • Variably intermittent wipers