Search any Make, Model, Year

2022 BMW M4

$64,887STOCK #: PW2577

Phone Number: 304-722-4900

Odometer: 5,387 ml
slide-1

SPECIFICATIONS OF THIS BMW M4

  • PRICE:$64,887
  • BODY STYLE:2D Convertible / Convertible
  • ODOMETER:5,387 MI
  • ENGINE:V6 3L
  • TRANSMISSION:8-Speed Automatic Steptronic
  • TRIM:Competition
  • DRIVE TRAIN:AWD
  • FUEL TYPE:Gasoline
  • COLOR:Alpine White
  • DOORS:2
  • MPG CITY:16

Description of BMW M4

BMW PRE-OWNED, SIRIUSXM APPLE CARPLAY, ANDROID AUTO, 19/20" M DUAL SPOKE BICOLOR WHEELS, COMFORT ACCESS KEYLESS ENTRY, CONVERTIBLE WIND DEFLECTOR, M COMPOUND BRAKES WITH RED CALIPERS, M SHADOWLINE LIGHTS, MOONLIGHT BLACK SOFT TOP, AUTO DDIMMING MIRRORS, FRONT VENTILATED SEATS, STORAGE PACKAGE, M SEAT BELTS, CARBON FIBER TRIM, NECK WARMER, ICON ADAPTIVE LED W/LASERLIGHT, HARMAON KARDON SURROUND SOUND SYSTEM, CONNECTEDDRIVE SERVICES, CONNECTED PACKAGE PRO LIMITED TERM, LIVE COCKPIT PRO INCL NAV, STEPTRONIC AUTOMATIC TRANS DRIVING ASSISTANCE PRO PACKAGE, EXTENDED TRAFFIC JAM ASSISTANT, ACTIVE DRIVING ASSISTANT PRO PARKING ASSISTANCE PACKAGE, PARKING ASSISTANT PLUS, DRIVE RECORDER EXECUTIVE PACKAGE, REMOTE ENGINE START, HEATED STEERING WHEEL, HEAD UP DISPLAY

EQUIPMENT AND OPTIONS OF THIS BMW M4

  • Navigation System
  • Moonlight Black SoftTop
  • 16 Speakers
  • AM/FM radio: SiriusXM with 360L
  • harman/kardon Surround Sound System
  • harman/kardon Speakers
  • Radio data system
  • Radio: AM/FM Audio System
  • SiriusXM w/360L
  • Air Conditioning
  • Automatic temperature control
  • Front dual zone A/C
  • Neck Warmer
  • Rear air conditioning
  • Rear window defroster
  • Head-Up Display
  • Lumbar Support
  • Memory seat
  • Power driver seat
  • Power steering
  • Power windows
  • Remote Engine Start
  • Remote keyless entry
  • Steering wheel mounted audio controls
  • Adaptive suspension
  • Four wheel independent suspension
  • Speed-sensing steering
  • Traction control
  • 4-Wheel Disc Brakes
  • ABS brakes
  • Dual front impact airbags
  • Dual front side impact airbags
  • Emergency communication system: BMW Assist eCall
  • Front anti-roll bar
  • Integrated roll-over protection
  • Knee airbag
  • Low tire pressure warning
  • M Compound Brakes w/Red Calipers
  • Occupant sensing airbag
  • Rear anti-roll bar
  • Brake assist
  • Electronic Stability Control
  • Exterior Parking Camera Rear
  • Auto High-beam Headlights
  • Delay-off headlights
  • Fully automatic headlights
  • Panic alarm
  • Security system
  • Active Driving Assistant Pro
  • Extended Traffic Jam Assistant
  • Speed control
  • Auto-dimming door mirrors
  • Bumpers: body-color
  • Convertible roof wind blocker
  • Heated door mirrors
  • Icon Adaptive LED Headlights w/Laserlight
  • M Shadowline Lights
  • Parking Assistant Plus
  • Power door mirrors
  • Turn signal indicator mirrors
  • Apple CarPlay & Android Auto Compatibility
  • Auto-dimming Rear-View mirror
  • BMW Assist eCall
  • BMW TeleServices
  • Carbon Fiber Trim
  • Compass
  • ConnectedDrive Services
  • Convertible roof lining
  • Drive Recorder
  • Driver door bin
  • Driver vanity mirror
  • Enhanced Bluetooth
  • Front reading lights
  • Garage door transmitter
  • Heated Steering Wheel
  • Illuminated entry
  • Leather Shift Knob
  • Live Cockpit Pro w/Navi
  • Outside temperature display
  • Overhead console
  • Passenger vanity mirror
  • Power convertible roof
  • Rear reading lights
  • Rear seat center armrest
  • Sport steering wheel
  • Tachometer
  • Telescoping steering wheel
  • Tilt steering wheel
  • Trip computer
  • Extended Merino Leather Upholstery
  • Front Bucket Seats
  • Front Center Armrest
  • Front Ventilated Seats
  • Heated Front Seats
  • Heated front seats
  • M Sport Seats
  • Power Front Seats
  • Power passenger seat
  • Passenger door bin
  • Alloy wheels
  • Wheels: 19" x 9.5" Fr/20" x 10.5" Rr (Style 826M)
  • Glass rear window
  • Rain sensing wipers
  • Speed-Sensitive Wipers
  • Variably intermittent wipers