Search any Make, Model, Year

2026 BMW M4

$105,695STOCK #: WC60224

Phone Number: 123-158-5154

Odometer: 12 ml
slide-1

SPECIFICATIONS OF THIS BMW M4

  • PRICE:$105,695
  • BODY STYLE:2D Convertible / Convertible
  • ODOMETER:12 MI
  • ENGINE:V6 3L
  • TRANSMISSION:8-Speed Automatic Sport
  • TRIM:Competition
  • DRIVE TRAIN:AWD
  • FUEL TYPE:Gasoline
  • COLOR:Skyscraper Grey Metallic
  • DOORS:2
  • MPG CITY:16

Description of BMW M4

NEW BMW, APPLE CARPLAY, AND ANDROID AUTO COMPATABLE, 19/20 M DUAL SPOKE BICOLOR FORGED 825M WHEELS, HEATED STEERING WHEEL, COMFORT ACCESS KEYLESS ENTRY, CONVERTABLE WIND DEFLECTOR, M COMPOUND BRAKES WITH RED CALIPERS, M SHADOWLINE LIGHTS, MOONLIGHT BLACK SOFT TOP, FRONT VENTILATED SEATS, M SEAT BELTS, CARBON FIBER TRIM, NECK WARMER, FULL LED HEADLIGHTS W/LASERLIGHT TAILLIGHTS, HARMAN KARDON SURROUND SOUND SYSTEM, CONNECTEDDRIVE SERVICES, CONNECTED PACKAGE PRO LIMITED TERM, ACTIVE BLIND SPOT DETECTION, FRONTAL COLLISION WARNING W/CITY COLLISION MITG, LANE DEPARTURE WARNING, LUGGAGE COMPARTMENT MAT DRIVING ASSISTANCE PRO PACKAGE, TRAFFIC JAM ASSISTANT, DRIVING ASSISTANT PRO PARKING ASSISTANCE PACKAGE, PARKING ASSISTANT PLUS EXECUTIVE PACKAGE, REMOTE ENGINE START, GALVANIC CONTROLS, LIVE COCKPIT PRO INCL NAV

EQUIPMENT AND OPTIONS OF THIS BMW M4

  • Navigation
  • Navigation System
  • Connected Package Pro Limited Term
  • Driving Assistance Professional Package
  • Executive Package
  • Parking Assistance Package
  • Moonlight Black SoftTop
  • 16 Speakers
  • AM/FM radio: SiriusXM with 360L
  • Audio memory
  • Harman/Kardon Surround Sound System
  • harman/kardon Speakers
  • Radio data system
  • Radio: AM/FM Audio System
  • SiriusXM with 360L and 1 Year Trial Subscription
  • Air Conditioning
  • Automatic temperature control
  • Front dual zone A/C
  • HVAC memory
  • Neck Warmer
  • Rear window defroster
  • Lumbar Support
  • Memory seat
  • Power driver seat
  • Power steering
  • Power windows
  • Remote Engine Start
  • Remote keyless entry
  • Steering wheel mounted audio controls
  • Adaptive suspension
  • Four wheel independent suspension
  • Speed-sensing steering
  • Traction control
  • 4-Wheel Disc Brakes
  • ABS brakes
  • Dual front impact airbags
  • Dual front side impact airbags
  • Emergency communication system: BMW Assist eCall
  • Front anti-roll bar
  • Integrated roll-over protection
  • Knee airbag
  • Low tire pressure warning
  • M Compound Brakes with Red Calipers
  • Occupant sensing airbag
  • Rear anti-roll bar
  • Brake assist
  • Electronic Stability Control
  • Exterior Parking Camera Rear
  • Auto High-beam Headlights
  • Delay-off headlights
  • Fully automatic headlights
  • Panic alarm
  • Security system
  • Distance Control Assist (DCA) with Steering Assistant
  • Driving Assistant Professional
  • Speed control
  • Traffic Jam Assistant
  • Auto-dimming door mirrors
  • Bumpers: body-color
  • Convertible roof wind blocker
  • Heated door mirrors
  • M Shadowline Lights
  • Parking Assistant Plus
  • Power door mirrors
  • Turn signal indicator mirrors
  • Apple CarPlay and Android Auto Compatibility
  • Auto-dimming Rear-View mirror
  • BMW Assist ECall
  • BMW TeleServices
  • Carbon Fiber Trim
  • Compass
  • ConnectedDrive Services
  • Convertible roof lining
  • Driver door bin
  • Driver vanity mirror
  • Front reading lights
  • Galvanic Controls
  • Garage door transmitter
  • Heated steering wheel
  • Illuminated entry
  • Leather Shift Knob
  • Leather steering wheel
  • Live Cockpit Pro with Navigation
  • Outside temperature display
  • Overhead console
  • Parking View with 3D View (Surround View)
  • Partial Automated Driving
  • Passenger vanity mirror
  • Personal ESIM 5G
  • Power convertible roof
  • Rear reading lights
  • Rear seat center armrest
  • Sport steering wheel
  • Tachometer
  • Telescoping steering wheel
  • Tilt steering wheel
  • Trip computer
  • Widescreen Display
  • Front Bucket Seats
  • Front Center Armrest
  • Front Ventilated Seats
  • Heated Front Seats
  • Heated front seats
  • M Sport Seats
  • Power Front Seats
  • Power passenger seat
  • Split folding rear seat
  • Passenger door bin
  • Alloy wheels
  • Wheels: 19" x 9.5" Front/20" x 10.5" Rear (style 826M)
  • Wheels: 19" x 9.5" Front/20" x 10.5" Rear M Dual-Spoke
  • Glass rear window
  • Rain sensing wipers
  • Speed-Sensitive Wipers
  • Variably intermittent wipers