2026 BMW M5
Phone Number: 123-158-5154
Odometer: 269 mlSPECIFICATIONS OF THIS BMW M5
- PRICE:$132,665
- BODY STYLE:4D Sedan / Sedan
- ODOMETER:269 MI
- ENGINE:V8 4.4L
- TRANSMISSION:8-Speed Automatic Sport
- TRIM:Base
- DRIVE TRAIN:AWD
- FUEL TYPE:Gasoline
- COLOR:Alpine White
- DOORS:4
- MPG CITY:
Description of BMW M5
NEW BMW, APPLE CARPLAY, AND ANDROID AUTO COMPATABLE, ACTIVE PARK DISTANCE CONTROL WITH SIDE PROTECTION, 20/21 M DUAL SPOKE JET BLACK 951M WHEELS, M DRIVE PROFESSIONAL, HEATED STEERING WHEEL, COMFORT ACCESS KEYLESS ENTRY, M COMPOUND BRAKES WITH RED CALIPERS, CARBON FIBER SILVER THREAD HIGH GLOSS TRIM, TRAVEL AND COMFORT SYSTEM, M SEAT BELTS, FLEXIBLE FAST CHARGER, CONNECTEDDRIVE SERVICES, CONNECTED PACKAGE PRO LIMITED TERM, M DRIVERS PACKAGE, ACTIVE BLIND SPOT DETECTION, LANE KEEPING ASSISTANT, FORWARD COLLISION MITIGATION, SPEED LIMIT ASSISTANT DRIVING ASSISTANCE PRO PACKAGE, DRIVING ASSISTANT PRO, TRAFFIC JAM ASSISTANT, LANE CHANGE ASSISTANT, PARTIAL AUTOMATED DRIVING EXECUTIVE PACKAGE, BMW ICONIC GLOW KIDNEY GRILLE, POWER REAR SUNSHADE AND REAR SIDE WINDOW SHADE, FRONT VENTILATED SEATS, FRONT AND REAR HEATED SEATS, INTERIOR CAMERA, PARKING ASSISTANT PLUS, PARKING VIEW WITH 3D VIEW








































