Search any Make, Model, Year

2026 BMW M5

$129,025STOCK #: B25180

Phone Number: 331-267-6216

Odometer: 131 ml
slide-1

SPECIFICATIONS OF THIS BMW M5

  • PRICE:$129,025
  • BODY STYLE:4D Sedan / Sedan
  • ODOMETER:131 MI
  • ENGINE:V8 4.4L
  • TRANSMISSION:8-Speed Automatic Sport
  • TRIM:Base
  • DRIVE TRAIN:AWD
  • FUEL TYPE:Gasoline
  • COLOR:Black Sapphire Metallic
  • DOORS:4
  • MPG CITY:

Description of BMW M5

Unlock Your Next Adventure with the brand new 2026 BMW M5 - Sleek, Smart, and Ready to Roll!Step into a world of possibilities with this stunning Black Sapphire Metallic 2026 BMW M5. Its aerodynamic design isn't just for looks--it's built to move you forward with style and efficiency. Under the hood, a reliable 4.4L V8 Turbocharged DOHC 32V LEV3-SULEV30 delivers performance you can count on for the long haul.Loaded with smart features such as , this M5 is more than a car--it's your passport to freedom. From daily commutes to weekend getaways, it's spacious enough to carry everything you need (and then some).Think the pictures look good? Just wait until you see it in your driveway.Fuel your drive. Embrace the journey. Your M5 is waiting.Experience the McGrath Legacy - 60+ Years of Driving ExcellenceWith four generations dedicated to delivering exceptional automotive experiences, the McGrath family has proudly served Chicagoland drivers for more than six decades. At McGrath BMW of Elmhurst, we're not just here to sell you your next BMW, we're here to build a lasting relationship by helping you maintain your vehicle and stay confidently on the road for years to come.As Chicagolands oldest BMW dealership, we're honored to serve customers across Elmhurst and surrounding suburbs such as Oak Brook, Butterfield, Wheaton, Glen Ellyn, Lombard, Villa Park, Glendale Heights, Carol Stream, Bloomingdale, Medinah, Roselle, Itasca, Addison, Wood Dale Bensenville, Franklin Park, Northlake, Berkeley, Bellwood, Elk Grove Village, La Grange Park and beyond. Every guest who walks through our door is treated like family, and it shows in everything we do.Discover a car-buying experience that goes beyond expectations - where legendary service meets the ultimate driving machine.Call us today at [phone] to schedule your exclusive VIP test drive and take your experience to the next level.*Dealer not responsible for typographical errors. Pictures are for illustration purposes only. All vehicles are subject to prior sales. See dealer for details. New vehicle prices include universally available manufacturer incentives & manufacturer rebates in lieu of special financing. Plus, tax, title, license & $377.63 doc fee, $199 Nitrogen Tires, $1995 First Place Finish. MSRP may not reflect the actual selling price at which vehicle is sold in trade area. New vehicle MPG's are EPA's estimated city and highway."When You Do the Math, You Choose McGrath"

EQUIPMENT AND OPTIONS OF THIS BMW M5

  • Wheels: 20" x 10.5" Front and 21" x 11" Rear M Dual-Spoke
  • BMW Iconic Glow Kidney Grille
  • Power Rear Sunshade and Rear Side Window Shades
  • Carbon Fiber Silver Thread High Gloss Trim
  • Front Ventilated Seats
  • Power Front Seats
  • Heated Front Seats
  • Front and Rear Heated Seats
  • M Multi-Function Seats
  • Interior Camera
  • Driving Assistant Professional
  • Parking Assistant Plus
  • SiriusXM with 360L and 1 Year Trial Subscription
  • BMW Assist ECall
  • BMW TeleServices
  • ConnectedDrive Services
  • Connected Package Pro Limited Term
  • Bowers & Wilkins Surround Sound
  • Wireless Device Charging
  • Personal ESIM 5G
  • BMW Curved Display with HUD
  • Training Service Fee
  • Merino Leather Upholstery
  • Radio: AM/FM Audio System
  • Apple CarPlay and Android Auto Compatibility
  • Driving Assistance Professional Package
  • Traffic Jam Assistant
  • Lane Change Assistant
  • Partial Automated Driving
  • Executive Package
  • Parking View with 3D View (Surround View)
  • 4-Wheel Disc Brakes
  • Emergency communication system: BMW Assist eCall
  • AM/FM radio: SiriusXM with 360L
  • Auto High-beam Headlights
  • Exterior Parking Camera Rear
  • Speed-Sensitive Wipers
  • Heads-Up Display
  • 18 Speakers
  • Auto-dimming Rear-View mirror
  • Variably intermittent wipers
  • Turn signal indicator mirrors
  • Trip computer
  • Traction control
  • Tilt steering wheel
  • Telescoping steering wheel
  • Steering wheel mounted audio controls
  • Steering wheel memory
  • Sport steering wheel
  • Split folding rear seat
  • Speed-sensing steering
  • Speed control
  • Security system
  • Remote keyless entry
  • Rear window defroster
  • Rear seat center armrest
  • Rear reading lights
  • Rear dual zone A/C
  • Rear anti-roll bar
  • Rear air conditioning
  • Rain sensing wipers
  • Radio data system
  • Power windows
  • Power steering
  • Power passenger seat
  • Power driver seat
  • Power door mirrors
  • Power adjustable front head restraints
  • Passenger vanity mirror
  • Passenger door bin
  • Panic alarm
  • Overhead airbag
  • Outside temperature display
  • Occupant sensing airbag
  • Memory seat
  • Low tire pressure warning
  • Leather steering wheel
  • Illuminated entry
  • Heated steering wheel
  • Heated front seats
  • Heated door mirrors
  • Head restraints memory
  • Garage door transmitter
  • Fully automatic headlights
  • Front reading lights
  • Front dual zone A/C
  • Front anti-roll bar
  • Four wheel independent suspension
  • Dual front side impact airbags
  • Dual front impact airbags
  • Driver vanity mirror
  • Driver door bin
  • Delay-off headlights
  • Bumpers: body-color
  • Brake assist
  • Automatic temperature control
  • Auto-dimming door mirrors
  • Auto tilt-away steering wheel
  • Alloy wheels
  • Adaptive suspension
  • ABS brakes
  • Tachometer
  • Navigation System
  • Front Center Armrest
  • Front Bucket Seats
  • Electronic Stability Control
  • Air Conditioning