Search any Make, Model, Year

2025 BMW M4

$85,000STOCK #: B6468P

Phone Number: 331-267-6216

Odometer: 12,886 ml
slide-1

SPECIFICATIONS OF THIS BMW M4

  • PRICE:$85,000
  • BODY STYLE:2D Coupe / Coupe
  • ODOMETER:12,886 MI
  • ENGINE:V6 3L
  • TRANSMISSION:8-Speed Automatic Sport
  • TRIM:Competition
  • DRIVE TRAIN:AWD
  • FUEL TYPE:Gasoline
  • COLOR:Toronto Red Metallic
  • DOORS:2
  • MPG CITY:16

Description of BMW M4

Recent Arrival! Unlock Your Next Adventure with the 2025 BMW M4 - Sleek, Smart, and Ready to Roll!Step into a world of possibilities with this stunning Toronto Red Metallic 2025 BMW M4. Its aerodynamic design isn't just for looks--it's built to move you forward with style and efficiency. Under the hood, a reliable 3.0L I6 Turbocharged DOHC 24V LEV3-ULEV70 523hp delivers performance you can count on for the long haul.Loaded with smart features such as , Connected Package Pro, Driving Assistance Professional Package (Active Driving Assistant Pro and Extended Traffic Jam Assistant), Executive Package (BMW Curved Display w/HUD, Heated Steering Wheel, Power Tailgate, and Remote Engine Start), Parking Assistance Package (Parking Assistant Plus), 16 Speakers, Adaptive suspension, Apple CarPlay & Android Auto Compatibility, Auto High-beam Headlights, Automatic temperature control, BMW Assist eCall, BMW TeleServices, Brake assist, Carbon Fiber Trim, ConnectedDrive Services, Delay-off headlights, Electronic Stability Control, Exterior Parking Camera Rear, Front dual zone A/C, Fully automatic headlights, Garage door transmitter, harman/kardon Surround Sound System, Heated Front Seats, Memory seat, Navigation, Navigation System, Personal eSIM 5G, Radio: AM/FM Audio System, SiriusXM w/360L, Steering wheel mounted audio controls, Turn signal indicator mirrors, and Widescreen Display, this M4 is more than a car--it's your passport to freedom. From daily commutes to weekend getaways, it's spacious enough to carry everything you need (and then some).Think the pictures look good? Just wait until you see it in your driveway.Fuel your drive. Embrace the journey. Your M4 is waiting.Experience the McGrath Legacy - 60+ Years of Driving ExcellenceWith four generations dedicated to delivering exceptional automotive experiences, the McGrath family has proudly served Chicagoland drivers for more than six decades. At McGrath BMW of Elmhurst, we're not just here to sell you your next BMW, we're here to build a lasting relationship by helping you maintain your vehicle and stay confidently on the road for years to come.As Chicagolands oldest BMW dealership, we're honored to serve customers across Elmhurst and surrounding suburbs such as Oak Brook, Butterfield, Wheaton, Glen Ellyn, Lombard, Villa Park, Glendale Heights, Carol Stream, Bloomingdale, Medinah, Roselle, Itasca, Addison, Wood Dale Bensenville, Franklin Park, Northlake, Berkeley, Bellwood, Elk Grove Village, La Grange Park and beyond. Every guest who walks through our door is treated like family, and it shows in everything we do.Discover a car-buying experience that goes beyond expectations - where legendary service meets the ultimate driving machine.Call us today at [phone] to schedule your exclusive VIP test drive and take your experience to the next level.*Dealer not responsible for typographical errors. Pictures are for illustration purposes only. All vehicles are subject to prior sales. See dealer for details. New vehicle prices include universally available manufacturer incentives & manufacturer rebates in lieu of special financing. Plus, tax, title, license & $377.63 doc fee, $199 Nitrogen Tires, $1995 First Place Finish. MSRP may not reflect the actual selling price at which vehicle is sold in trade area. New vehicle MPG's are EPA's estimated city and highway."When You Do the Math, You Choose McGrath"

EQUIPMENT AND OPTIONS OF THIS BMW M4

  • Navigation
  • Navigation System
  • Connected Package Pro
  • Driving Assistance Professional Package
  • Executive Package
  • Parking Assistance Package
  • 16 Speakers
  • AM/FM radio: SiriusXM with 360L
  • Audio memory
  • harman/kardon Surround Sound System
  • harman/kardon Speakers
  • Radio data system
  • Radio: AM/FM Audio System
  • SiriusXM w/360L
  • Air Conditioning
  • Automatic temperature control
  • Front dual zone A/C
  • HVAC memory
  • Rear window defroster
  • Lumbar Support
  • Memory seat
  • Power driver seat
  • Power steering
  • Power windows
  • Remote Engine Start
  • Remote keyless entry
  • Steering wheel mounted audio controls
  • Adaptive suspension
  • Four wheel independent suspension
  • Speed-sensing steering
  • Traction control
  • 4-Wheel Disc Brakes
  • ABS brakes
  • Dual front impact airbags
  • Dual front side impact airbags
  • Emergency communication system: BMW Assist eCall
  • Front anti-roll bar
  • Knee airbag
  • Low tire pressure warning
  • M Compound Brakes w/Red Calipers
  • Occupant sensing airbag
  • Overhead airbag
  • Rear anti-roll bar
  • Power Tailgate
  • Brake assist
  • Electronic Stability Control
  • Exterior Parking Camera Rear
  • Auto High-beam Headlights
  • Delay-off headlights
  • Fully automatic headlights
  • Panic alarm
  • Security system
  • Active Driving Assistant Pro
  • Extended Traffic Jam Assistant
  • Speed control
  • Auto-dimming door mirrors
  • Bumpers: body-color
  • Heated door mirrors
  • Parking Assistant Plus
  • Power door mirrors
  • Spoiler
  • Turn signal indicator mirrors
  • Apple CarPlay & Android Auto Compatibility
  • Auto-dimming Rear-View mirror
  • BMW Assist eCall
  • BMW Curved Display w/HUD
  • BMW TeleServices
  • Carbon Fiber Trim
  • Compass
  • ConnectedDrive Services
  • Driver door bin
  • Driver vanity mirror
  • Front reading lights
  • Garage door transmitter
  • Heated Steering Wheel
  • Illuminated entry
  • Leather Shift Knob
  • Leather steering wheel
  • Outside temperature display
  • Overhead console
  • Passenger vanity mirror
  • Personal eSIM 5G
  • Rear reading lights
  • Rear seat center armrest
  • Sport steering wheel
  • Tachometer
  • Telescoping steering wheel
  • Tilt steering wheel
  • Trip computer
  • Widescreen Display
  • Extended Merino Leather Upholstery
  • Front Bucket Seats
  • Front Center Armrest
  • Heated Front Seats
  • Heated front seats
  • M Sport Seats
  • Power Front Seats
  • Power passenger seat
  • Split folding rear seat
  • Passenger door bin
  • Alloy wheels
  • Wheels: 19" x 9.5" Fr/20" x 10.5" Rr (Style 826M)
  • Wheels: 19" x 9.5" Fr/20" x 10.5" Rr Forged Black
  • Rain sensing wipers
  • Speed-Sensitive Wipers
  • Variably intermittent wipers