2026 BMW M4

Ultra Low Miles 4WD / AWD
$103,475STOCK #: B24507

Phone Number: 331-267-6216

Odometer: 18 ml
slide-1

SPECIFICATIONS OF THIS BMW M4

  • PRICE:$103,475
  • BODY STYLE:2D Convertible / Convertible
  • ODOMETER:18 MI
  • ENGINE:V6 3L
  • TRANSMISSION:8-Speed Automatic Sport
  • TRIM:Competition
  • DRIVE TRAIN:AWD
  • FUEL TYPE:Gasoline
  • COLOR:Tanzanite Blue II Metallic
  • DOORS:2
  • MPG CITY:16

Description of BMW M4

Unlock Your Next Adventure with the brand new 2026 BMW M4 - Sleek, Smart, and Ready to Roll!Step into a world of possibilities with this stunning Tanzanite Blue II Metallic 2026 BMW M4. Its aerodynamic design isn't just for looks--it's built to move you forward with style and efficiency. Under the hood, a reliable 3.0L I6 Turbocharged DOHC 24V LEV3-ULEV70 523hp delivers performance you can count on for the long haul.Loaded with smart features such as , this M4 is more than a car--it's your passport to freedom. From daily commutes to weekend getaways, it's spacious enough to carry everything you need (and then some).Think the pictures look good? Just wait until you see it in your driveway.Fuel your drive. Embrace the journey. Your M4 is waiting.Experience the McGrath Legacy - 60+ Years of Driving ExcellenceWith four generations dedicated to delivering exceptional automotive experiences, the McGrath family has proudly served Chicagoland drivers for more than six decades. At McGrath BMW of Elmhurst, we're not just here to sell you your next BMW, we're here to build a lasting relationship by helping you maintain your vehicle and stay confidently on the road for years to come.As Chicagolands oldest BMW dealership, we're honored to serve customers across Elmhurst and surrounding suburbs such as Oak Brook, Butterfield, Wheaton, Glen Ellyn, Lombard, Villa Park, Glendale Heights, Carol Stream, Bloomingdale, Medinah, Roselle, Itasca, Addison, Wood Dale Bensenville, Franklin Park, Northlake, Berkeley, Bellwood, Elk Grove Village, La Grange Park and beyond. Every guest who walks through our door is treated like family, and it shows in everything we do.Discover a car-buying experience that goes beyond expectations - where legendary service meets the ultimate driving machine.Call us today at [phone] to schedule your exclusive VIP test drive and take your experience to the next level.*Dealer not responsible for typographical errors. Pictures are for illustration purposes only. All vehicles are subject to prior sales. See dealer for details. New vehicle prices include universally available manufacturer incentives & manufacturer rebates in lieu of special financing. Plus, tax, title, license & $377.63 doc fee, $199 Nitrogen Tires, $1995 First Place Finish. MSRP may not reflect the actual selling price at which vehicle is sold in trade area. New vehicle MPG's are EPA's estimated city and highway."When You Do the Math, You Choose McGrath"

EQUIPMENT AND OPTIONS OF THIS BMW M4

Comfort & Convenience

  • Remote Engine Start
  • Wheels: 19" x 9.5" Front/20" x 10.5" Rear Forged Black
  • Front Ventilated Seats
  • Power Front Seats
  • Heated Front Seats
  • Connected Package Pro Limited Term
  • M Sport Seats
  • Executive Package
  • Tilt steering wheel
  • Telescoping steering wheel
  • Sport steering wheel
  • Split folding rear seat
  • Speed-sensing steering
  • Remote keyless entry
  • Rear seat center armrest
  • Power windows
  • Power steering
  • Power passenger seat
  • Power driver seat
  • Power door mirrors
  • Power convertible roof
  • Memory seat
  • Leather steering wheel
  • Illuminated entry
  • Heated steering wheel
  • Heated front seats
  • Heated door mirrors
  • HVAC memory
  • Tachometer
  • Leather Shift Knob
  • Front Bucket Seats

Exterior & Mechanical

  • Wheels: 19" x 9.5" Front/20" x 10.5" Rear (style 826M)
  • Auto High-beam Headlights
  • Speed-Sensitive Wipers
  • Auto-dimming Rear-View mirror
  • Variably intermittent wipers
  • Turn signal indicator mirrors
  • Rain sensing wipers
  • Passenger vanity mirror
  • Low tire pressure warning
  • Fully automatic headlights
  • Four wheel independent suspension
  • Driver vanity mirror
  • Delay-off headlights
  • Convertible roof lining
  • Auto-dimming door mirrors
  • Alloy wheels
  • Adaptive suspension

Other Features

  • Lumbar Support
  • Carbon Fiber Trim
  • Galvanic Controls
  • SiriusXM with 360L and 1 Year Trial Subscription
  • Harman/Kardon Surround Sound System
  • BMW TeleServices
  • ConnectedDrive Services
  • Personal ESIM 5G
  • Training Service Fee
  • Parking View with 3D View (Surround View)
  • Compass
  • Trip computer
  • Speed control
  • Rear window defroster
  • Rear reading lights
  • Rear anti-roll bar
  • Passenger door bin
  • Overhead console
  • Outside temperature display
  • Integrated roll-over protection
  • Glass rear window
  • Garage door transmitter
  • Front reading lights
  • Front dual zone A/C
  • Front anti-roll bar
  • Driver door bin
  • Bumpers: body-color
  • Automatic temperature control
  • Front Center Armrest
  • Air Conditioning

Safety & Security

  • Parking Assistant Plus
  • BMW Assist ECall
  • Parking Assistance Package
  • 4-Wheel Disc Brakes
  • Emergency communication system: BMW Assist eCall
  • Traction control
  • Security system
  • Panic alarm
  • Occupant sensing airbag
  • Knee airbag
  • Dual front side impact airbags
  • Dual front impact airbags
  • Convertible roof wind blocker
  • Brake assist
  • ABS brakes
  • Electronic Stability Control

Technology & Entertainment

  • Navigation
  • Live Cockpit Pro with Navigation
  • Widescreen Display
  • Radio: AM/FM Audio System
  • Apple CarPlay and Android Auto Compatibility
  • AM/FM radio: SiriusXM with 360L
  • harman/kardon Speakers
  • Exterior Parking Camera Rear
  • 16 Speakers
  • Steering wheel mounted audio controls
  • Radio data system
  • Audio memory
  • Navigation System