2025 BMW M5
Ultra Low Miles 4WD / AWD
$122,890STOCK #: WC50104
Phone Number: 304-722-4900
Odometer: 554 mlSPECIFICATIONS OF THIS BMW M5
- PRICE:$122,890
- BODY STYLE:4D Sedan / Sedan
- ODOMETER:554 MI
- ENGINE:V8 4.4L
- TRANSMISSION:8-Speed Automatic Sport
- TRIM:Base
- DRIVE TRAIN:AWD
- FUEL TYPE:Gasoline
- COLOR:Storm Bay Metallic
- DOORS:4
- MPG CITY:
Description of BMW M5
NEW, APPLE CARPLAY, AND ANDROID AUTO COMPATABLE, M DRIVE PROFESSIONAL, HEATED STEERING WHEEL, MOBILITY KIT, CONFORT ACCESS KEYLESS ENTRY, CARBON FIBER SILER THREAD HIGH GLOSS TRIM, TRAVEL AND COMFORT SYSTEM, M SEAT BELTS, FLEXIBLE FAST CHARGER, NEMA 5-15 10A CHARGING ADAPTER, CONNECTEDDRIVE SERVICES, CONNECTED PACKAGE PRO, DAYTIME RUNNING LIGHTS, ACTIVE BLIND SPOT DETECTION, LANE DEPARTURE WARNING, 20/21 M DUAL SPOKE DARK GRAY 951M DRIVING ASSISTANCE PROFESSIONAL PACKAGE, ACTIVE DRIVING ASSISTANT PRO CARBON PACKAGE, M CARBON EXTERIOR PACKAGE EXECUTIVE PACKAGE, BME ICONIC GLOW KIDNEY GRILLE, POWER REAR SUNSHADE AND REAR SIDE WINDOW SHADE, FRONT VENTILATED SEATS, FRONT AND REAR HEATED SEATS, INTERIOR CAMERA, PARKING ASSISTANT PLUS
EQUIPMENT AND OPTIONS OF THIS BMW M5
Technology & Entertainment
- Navigation System
- 18 Speakers
- AM/FM radio: SiriusXM
- Radio data system
- Radio: AM/FM Audio System
- SiriusXM Satellite Radio w/1-Year Subscription
- Steering wheel mounted audio controls
- Exterior Parking Camera Rear
- Apple CarPlay & Android Auto Compatibility
- Interior Camera
Comfort & Convenience
- Carbon Package
- Connected Package Pro
- Executive Package
- M Carbon Exterior Package
- Memory seat
- Power driver seat
- Power steering
- Power windows
- Remote keyless entry
- Steering wheel memory
- Speed-sensing steering
- Heated door mirrors
- Power door mirrors
- Auto tilt-away steering wheel
- Heated steering wheel
- Illuminated entry
- Leather steering wheel
- M Multi-Function Seats
- Rear seat center armrest
- Sport steering wheel
- Tachometer
- Telescoping steering wheel
- Tilt steering wheel
- Extended Merino Leather Upholstery
- Front & Rear Heated Seats
- Front Bucket Seats
- Front Ventilated Seats
- Heated Front Seats
- Heated front seats
- Power Front Seats
- Power passenger seat
- Split folding rear seat
- Power Rear Sunshade & Rear Side Window Shades
Safety & Security
- Driving Assistance Professional Package
- Traction control
- 4-Wheel Disc Brakes
- ABS brakes
- Dual front impact airbags
- Dual front side impact airbags
- Emergency communication system: BMW Assist eCall
- Occupant sensing airbag
- Overhead airbag
- Brake assist
- Electronic Stability Control
- Panic alarm
- Security system
- Active Driving Assistant Pro
- BMW Assist eCall
- Parking Assistant Plus
Other Features
- Bowers & Wilkins Surround Sound
- Air Conditioning
- Automatic temperature control
- Front dual zone A/C
- Rear air conditioning
- Rear dual zone A/C
- Rear window defroster
- Heads-Up Display
- Front anti-roll bar
- Rear anti-roll bar
- Speed control
- BMW Iconic Glow Kidney Grille
- Bumpers: body-color
- BMW Curved Display w/HUD
- BMW TeleServices
- Carbon Fiber Silver Thread High Gloss Trim
- ConnectedDrive Services
- Driver door bin
- Front reading lights
- Garage door transmitter
- M Drive Professional
- Outside temperature display
- Personal eSIM 5G
- Rear reading lights
- Trip computer
- Wireless Device Charging
- Front Center Armrest
- Passenger door bin
Exterior & Mechanical
- Adaptive suspension
- Four wheel independent suspension
- Low tire pressure warning
- Auto High-beam Headlights
- Delay-off headlights
- Fully automatic headlights
- Auto-dimming door mirrors
- Carbon Fiber Reinforced Polymer Roof
- Mirror Caps
- Spoiler
- Turn signal indicator mirrors
- Auto-dimming Rear-View mirror
- Driver vanity mirror
- Passenger vanity mirror
- Alloy wheels
- Wheels: 20" x 10.5" Fr & 21" x 11" Rr M Dual-Spk
- Wheels: 20" x 10.5" Fr & 21" x 11" Rr M Dual-Spoke
- Rain sensing wipers
- Speed-Sensitive Wipers
- Variably intermittent wipers



































