2026 BMW M4

Ultra Low Miles 4WD / AWD
$91,888STOCK #: 12908P

Phone Number: 630-835-0386

Odometer: 12,852 ml
slide-1

SPECIFICATIONS OF THIS BMW M4

  • PRICE:$91,888
  • BODY STYLE:2D Coupe / Coupe
  • ODOMETER:12,852 MI
  • ENGINE:V6 3L
  • TRANSMISSION:8-Speed Automatic Sport
  • TRIM:Competition
  • DRIVE TRAIN:AWD
  • FUEL TYPE:Gasoline
  • COLOR:Isle of Man Green Metallic
  • DOORS:2
  • MPG CITY:16

Description of BMW M4

Experience the pinnacle of performance and sophistication with this exceptional 2026 BMW M4 Competition. Meticulously crafted to deliver uncompromising power and dynamic handling, this stunning sports coupe is poised to captivate the discerning driver.- M Shadowline Lights- M Carbon Bucket Seats- Carbon Fiber Trim- Drive Recorder- M Alcantara Steering Wheel- Isle of Man Green Metallic exterior with Ivory White Merino Leather upholstery- Parking Assistance Package with Parking View and 3D Surround View- Executive Package featuring Remote Engine Start, Live Cockpit Pro with Navigation, and Galvanic ControlsPowered by a potent 3.0L I6 Turbocharged engine producing an exhilarating 523 horsepower, this M4 Competition delivers thrilling acceleration and responsive performance. The 8-speed automatic transmission with Sport mode seamlessly channels the engine's power to the advanced AWD system, ensuring exceptional traction and control in any driving condition.Beyond its raw power, this M4 Competition pampers its occupants with an array of premium features. The M Alcantara steering wheel, M Carbon Bucket Seats, and Ivory White Merino Leather upholstery create an atmosphere of refined luxury, while the Harman Kardon surround sound system and Live Cockpit Pro with Navigation provide cutting-edge connectivity and entertainment.For the driver seeking the ultimate in performance and style, this 2026 BMW M4 Competition is a true masterpiece. With its striking appearance, exhilarating driving dynamics, and an impressive list of premium amenities, this sports coupe is poised to captivate and inspire. We invite you to experience its unparalleled capabilities firsthand and discover the joy of owning a true automotive icon.

EQUIPMENT AND OPTIONS OF THIS BMW M4

Technology & Entertainment

  • Navigation
  • Navigation System
  • 16 Speakers
  • AM/FM radio: SiriusXM with 360L
  • Audio memory
  • harman/kardon Speakers
  • Radio data system
  • Radio: AM/FM Audio System
  • Steering wheel mounted audio controls
  • Exterior Parking Camera Rear
  • Apple CarPlay and Android Auto Compatibility
  • Live Cockpit Pro with Navigation
  • Widescreen Display

Comfort & Convenience

  • Connected Package Pro Limited Term
  • Executive Package
  • HVAC memory
  • Memory seat
  • Power driver seat
  • Power steering
  • Power windows
  • Remote Engine Start
  • Remote keyless entry
  • M Alcantara Steering Wheel
  • Speed-sensing steering
  • Heated door mirrors
  • Power door mirrors
  • Heated steering wheel
  • Illuminated entry
  • Leather Shift Knob
  • Leather steering wheel
  • M Carbon Bucket Seats
  • Rear seat center armrest
  • Sport steering wheel
  • Tachometer
  • Telescoping steering wheel
  • Tilt steering wheel
  • Front Bucket Seats
  • Heated Front Seats
  • Heated front seats
  • M Sport Seats
  • Power Front Seats
  • Power passenger seat
  • Split folding rear seat
  • Wheels: 19" x 9.5" Front/20" x 10.5" Rear Forged Black

Safety & Security

  • Parking Assistance Package
  • Traction control
  • 4-Wheel Disc Brakes
  • ABS brakes
  • Dual front impact airbags
  • Dual front side impact airbags
  • Emergency communication system: BMW Assist eCall
  • Knee airbag
  • M Compound Brakes with Red Calipers
  • Occupant sensing airbag
  • Overhead airbag
  • Brake assist
  • Electronic Stability Control
  • Panic alarm
  • Security system
  • BMW Assist ECall
  • Parking Assistant Plus

Other Features

  • Harman/Kardon Surround Sound System
  • SiriusXM with 360L and 1 Year Trial Subscription
  • Air Conditioning
  • Automatic temperature control
  • Front dual zone A/C
  • Rear window defroster
  • Lumbar Support
  • Front anti-roll bar
  • Rear anti-roll bar
  • Speed control
  • Bumpers: body-color
  • M Shadowline Lights
  • BMW TeleServices
  • Carbon Fiber Trim
  • Compass
  • ConnectedDrive Services
  • Drive Recorder
  • Driver door bin
  • Front reading lights
  • Galvanic Controls
  • Garage door transmitter
  • Outside temperature display
  • Overhead console
  • Parking View with 3D View (Surround View)
  • Personal ESIM 5G
  • Rear reading lights
  • Trip computer
  • Front Center Armrest
  • Passenger door bin

Exterior & Mechanical

  • Adaptive suspension
  • Four wheel independent suspension
  • Low tire pressure warning
  • Auto High-beam Headlights
  • Delay-off headlights
  • Fully automatic headlights
  • Auto-dimming door mirrors
  • Spoiler
  • Turn signal indicator mirrors
  • Auto-dimming Rear-View mirror
  • Driver vanity mirror
  • Passenger vanity mirror
  • Alloy wheels
  • Wheels: 19" x 9.5" Front/20" x 10.5" Rear (style 826M)
  • Rain sensing wipers
  • Speed-Sensitive Wipers
  • Variably intermittent wipers