2016 BMW M3
Phone Number: 331-267-6216
Odometer: 42,283 mlSPECIFICATIONS OF THIS BMW M3
- PRICE:$52,184
- BODY STYLE:4D Sedan / Sedan
- ODOMETER:42,283 MI
- ENGINE:V6 3L
- TRANSMISSION:6-Speed Manual
- TRIM:Base
- DRIVE TRAIN:RWD
- FUEL TYPE:Gasoline
- COLOR:Mineral Gray Metallic
- DOORS:4
- MPG CITY:17
Description of BMW M3
This 2016 BMW M3 Base in Mineral Gray Metallic represents a sophisticated choice for drivers seeking a refined performance sedan with distinctive character and proven engineering.- 7-Speed M-Double Clutch Transmission with Drivelogic- Adaptive M Suspension- 19" Black Light-Alloy Wheels with Performance Tires- Executive Package with Heated Rear Seats and Heated Steering Wheel- Head-Up Display- Adaptive Full LED Lighting with Automatic High Beams- Premium harman/kardon Surround Sound System with 16 Speakers- SiriusXM Satellite Radio- Navigation System- Side & Top View Cameras with Rear-View Camera- Park Distance Control- Sakhir Orange and Black Full Merino Leather Upholstery- Power Rear Sunshade and Manual Rear Side Window Shades- Retractable Headlight WashersThe interior of this M3 presents an executive environment with its premium Sakhir Orange and Black Merino leather upholstery and heated front sport seats. The Adaptive M Suspension combines comfort with responsive handling dynamics, while the dual-zone automatic climate control maintains your preferred temperature with rear air conditioning for all passengers. Advanced driver aids include Park Distance Control, multiple camera views, and Electronic Stability Control with traction management to support your driving confidence in various conditions.Technology integrates seamlessly throughout the cabin. The Navigation System works alongside the Head-Up Display to keep vital information in your line of sight, while steering wheel-mounted audio controls allow you to manage the exceptional harman/kardon system without distraction. SiriusXM satellite radio with a one-year subscription, CD and DVD-Audio capability, and emergency communication through BMW Assist eCall round out the connected experience.This vehicle presents 42,280 miles on its odometer, offering considerable life remaining for an owner ready to enjoy its capabilities. The 3.0L I6 engine paired with the 6-Speed Manual transmission delivers a direct connection to the driving experience, achieving 17 MPG city and 26 MPG highway. The combination of RWD architecture with the responsive suspension creates a balanced platform for both daily driving and more engaging road sessions.Standard safety provisions include dual front and side impact airbags, knee airbags, overhead airbags, and four-wheel disc brakes with ABS. Speed-sensing steering adjusts to your driving conditions, while rain-sensing wipers and fully automatic headlights with bi-xenon capability address varying weather without requiring manual intervention.As Chicagolands oldest BMW dealership, we're honored to serve customers across Elmhurst and surrounding suburbs such as Oak Brook, Butterfield, Wheaton, Glen Ellyn, Lombard, Villa Park, Glendale Heights, Carol Stream, Bloomingdale, Medinah, Roselle, Itasca, Addison,Call us today at [phone] to schedule your exclusive VIP test drive and discover the quality, value, and confidence that come with driving one of our exceptional pre-owned vehicles.Dealer not responsible for typographical errors. Pictures are for illustration purposes only and may not represent the actual vehicle. All vehicles are subject to prior sale. See dealer for complete details. Pre-owned vehicle pricing excludes tax, title, license, and a $377.63 doc fee. Optional $199 Nitrogen Tires, and $1,995 First Place Finish. Vehicle availability, equipment, features, mileage, and condition may vary.

































