2023 BMW M5

Low Mileage 4WD / AWD
$80,412STOCK #: B6534LP

Phone Number: 331-267-6216

Odometer: 39,933 ml
slide-1

SPECIFICATIONS OF THIS BMW M5

  • PRICE:$80,412
  • BODY STYLE:4D Sedan / Sedan
  • ODOMETER:39,933 MI
  • ENGINE:V8 4.4L
  • TRANSMISSION:8-Speed Automatic Sport
  • TRIM:Base
  • DRIVE TRAIN:AWD
  • FUEL TYPE:Gasoline
  • COLOR:Alpine White
  • DOORS:4
  • MPG CITY:15

Description of BMW M5

Experience the epitome of high-performance luxury with this exceptional 2023 BMW M5 Base. Boasting a powerful 4.4L V8 Turbocharged engine delivering 600 horsepower, this M5 is engineered to thrill.- WHEELS: 20" X 9.5" FR & 20" X 10.5" RR BLACK Style 706M, M double-spoke, Tires: 275/35R20 Fr & 285/35R20 Rr Performance, Non run-flat- BOWERS & WILKINS DIAMOND SURROUND SOUND SYSTEM- BLACK, FULL MERINO LEATHER UPHOLSTERY- COMPETITION PACKAGE with Extended Shadowline Trim, M Sport Exhaust System, and more- DRIVING ASSISTANCE PROFESSIONAL PACKAGE including Active Cruise Control and Lane Keeping Assistant- EXECUTIVE PACKAGE with Front Ventilated Seats, Soft-Close Doors, Surround View Camera, and moreThis M5 has been meticulously maintained and is ready to provide an exhilarating driving experience. With just 39,933 miles, it's the perfect balance of performance, luxury, and value.Discover the confidence and quality that come with owning this exceptional pre-owned BMW. Call us today at [phone] to schedule your VIP test drive.As Chicagolands oldest BMW dealership, we're honored to serve customers across Elmhurst and surrounding suburbs such as Oak Brook, Butterfield, Wheaton, Glen Ellyn, Lombard, Villa Park, Glendale Heights, Carol Stream, Bloomingdale, Medinah, Roselle, Itasca, Addison,Call us today at [phone] to schedule your exclusive VIP test drive and discover the quality, value, and confidence that come with driving one of our exceptional pre-owned vehicles.Dealer not responsible for typographical errors. Pictures are for illustration purposes only and may not represent the actual vehicle. All vehicles are subject to prior sale. See dealer for complete details. Pre-owned vehicle pricing excludes tax, title, license, and a $377.63 doc fee. Optional $199 Nitrogen Tires, and $1,995 First Place Finish. Vehicle availability, equipment, features, mileage, and condition may vary.

EQUIPMENT AND OPTIONS OF THIS BMW M5

Technology & Entertainment

  • Navigation System
  • 16 Speakers
  • AM/FM radio: SiriusXM
  • harman/kardon Speakers
  • Radio data system
  • Radio: AM/FM Audio System
  • SiriusXM Satellite Radio w/1 Year Subscription
  • Steering wheel mounted audio controls
  • Exterior Parking Camera Rear
  • Rear-View Camera
  • Apple CarPlay & Android Auto Compatibility

Comfort & Convenience

  • Competition Package
  • Competition Package (7MA)
  • Connected Package Pro
  • Executive Package
  • Memory seat
  • Power driver seat
  • Power steering
  • Power windows
  • Remote keyless entry
  • Steering wheel memory
  • Speed-sensing steering
  • M Seat Belts
  • Heated door mirrors
  • Power door mirrors
  • Active Park Distance Control
  • Auto tilt-away steering wheel
  • Heated steering wheel
  • Illuminated entry
  • Leather Shift Knob
  • Leather steering wheel
  • Rear seat center armrest
  • Sport steering wheel
  • Tachometer
  • Telescoping steering wheel
  • Tilt steering wheel
  • Extended Merino Leather Upholstery
  • Front & Rear Heated Seats
  • Front Bucket Seats
  • Front Massaging Seats
  • Front Ventilated Seats
  • Heated Front Seats
  • Heated front seats
  • Multi-Function Seats w/Lumbar Support
  • Power Front Seats
  • Power passenger seat
  • Split folding rear seat
  • Wheels: 20" x 9.5" Fr & 20" x 10.5" Rr Black
  • Power Rear Sunshade & Rear Side Window Shades

Safety & Security

  • Driving Assistance Professional Package
  • Traction control
  • 4-Wheel Disc Brakes
  • ABS brakes
  • Dual front impact airbags
  • Dual front side impact airbags
  • Emergency communication system: BMW Assist eCall
  • M Compound Brakes w/Red Calipers
  • Occupant sensing airbag
  • Overhead airbag
  • Brake assist
  • Electronic Stability Control
  • Panic alarm
  • Security system
  • Extended Traffic Jam Assistant
  • Active Driving Assistant Pro
  • BMW Assist eCall
  • Parking Assistant Plus

Other Features

  • Bowers & Wilkins Diamond Surround Sound System
  • harman/kardon Surround Sound System
  • Air Conditioning
  • Automatic temperature control
  • Front dual zone A/C
  • Rear air conditioning
  • Rear dual zone A/C
  • Rear window defroster
  • Heads-Up Display
  • Front anti-roll bar
  • Rear anti-roll bar
  • Soft-Close Automatic Doors
  • Speed control
  • Bumpers: body-color
  • Extended Shadowline Trim
  • M Shadowline Lights
  • Aluminum Dark Carbon Structure Trim
  • BMW TeleServices
  • ConnectedDrive Services
  • Drive Recorder
  • Driver door bin
  • Front reading lights
  • Garage door transmitter
  • Gesture Control
  • Live Cockpit Pro w/Navi
  • Outside temperature display
  • Rear reading lights
  • Surround View w/3D View
  • Trip computer
  • WiFi Hotspot
  • Wireless Charging
  • Front Center Armrest
  • Passenger door bin

Exterior & Mechanical

  • Adaptive suspension
  • Four wheel independent suspension
  • Low tire pressure warning
  • Auto High-beam Headlights
  • Delay-off headlights
  • Fully automatic headlights
  • Auto-dimming door mirrors
  • Spoiler
  • Turn signal indicator mirrors
  • Auto-dimming Rear-View mirror
  • Driver vanity mirror
  • Passenger vanity mirror
  • Alloy wheels
  • Wheels: 19" x 9.5" Fr & 19" x 10.5" Rr Bi-Color
  • Wheels: 20" x 9.5" Fr & 20" x 10.5" Rr M Y-Spoke
  • Rain sensing wipers
  • Speed-Sensitive Wipers
  • Variably intermittent wipers