2024 BMW M4

Low Mileage 4WD / AWD
$74,823STOCK #: B25359A

Phone Number: 331-267-6216

Odometer: 37,185 ml
slide-1

SPECIFICATIONS OF THIS BMW M4

  • PRICE:$74,823
  • BODY STYLE:2D Coupe / Coupe
  • ODOMETER:37,185 MI
  • ENGINE:V6 3L
  • TRANSMISSION:8-Speed Automatic Sport
  • TRIM:Competition
  • DRIVE TRAIN:AWD
  • FUEL TYPE:Gasoline
  • COLOR:Black Sapphire Metallic
  • DOORS:2
  • MPG CITY:16

Description of BMW M4

This 2024 BMW M4 Competition is a true performance powerhouse, engineered to thrill the senses and conquer the road. With its potent 3.0L I6 Turbocharged engine delivering an exhilarating 503 horsepower, this M4 Competition delivers heart-pounding acceleration and dynamic handling that will leave you craving more.- M DRIVE PROFESSIONAL- M SHADOWLINE LIGHTS- FRONT VENTILATED SEATS- Black Sapphire Metallic- CARBON FIBER TRIM- ICON ADAPTIVE LED HEADLIGHTS W/LASERLIGHT- DRIVE RECORDER- DRIVING ASSISTANCE PROFESSIONAL PACKAGE- PARKING ASSISTANCE PACKAGE- EXECUTIVE PACKAGEPacked with an array of premium features, this exceptional M4 Competition showcases BMW's commitment to engineering excellence. The Driving Assistance Professional Package provides advanced driver aids, while the Executive Package adds convenience with Remote Engine Start, Power Tailgate, and the stunning BMW Curved Display with Head-Up Display.Slip behind the wheel and experience the true essence of the M lineup, with precision-tuned suspension, responsive steering, and the iconic M Sport seats hugging you in all the right places. Whether carving through winding roads or effortlessly cruising the highway, this 2024 BMW M4 Competition delivers an unparalleled driving experience.With just 37,084 miles, this meticulously maintained M4 Competition represents an exceptional value. Outfitted in striking Black Sapphire Metallic and featuring a wealth of premium upgrades, this is a rare opportunity to own a well-equipped, low-mileage BMW M car.Don't miss your chance to make this 2024 BMW M4 Competition your own. Call us today at [phone] to schedule your exclusive VIP test drive and discover the quality, value, and confidence that come with driving one of our exceptional pre-owned vehicles.As Chicagolands oldest BMW dealership, we're honored to serve customers across Elmhurst and surrounding suburbs such as Oak Brook, Butterfield, Wheaton, Glen Ellyn, Lombard, Villa Park, Glendale Heights, Carol Stream, Bloomingdale, Medinah, Roselle, Itasca, Addison,Dealer not responsible for typographical errors. Pictures are for illustration purposes only and may not represent the actual vehicle. All vehicles are subject to prior sale. See dealer for complete details. Pre-owned vehicle pricing excludes tax, title, license, and a $377.63 doc fee. Optional $199 Nitrogen Tires, and $1,995 First Place Finish. Vehicle availability, equipment, features, mileage, and condition may vary.

EQUIPMENT AND OPTIONS OF THIS BMW M4

Technology & Entertainment

  • Navigation
  • Navigation System
  • 16 Speakers
  • AM/FM radio: SiriusXM with 360L
  • harman/kardon Speakers
  • Radio data system
  • Radio: AM/FM Audio System
  • Steering wheel mounted audio controls
  • Exterior Parking Camera Rear
  • Widescreen Display

Comfort & Convenience

  • Connected Package Pro
  • Executive Package
  • Memory seat
  • Power driver seat
  • Power steering
  • Power windows
  • Remote Engine Start
  • Remote keyless entry
  • Speed-sensing steering
  • Power Tailgate
  • Heated door mirrors
  • Power door mirrors
  • Heated Steering Wheel
  • Illuminated entry
  • Leather Shift Knob
  • Leather steering wheel
  • Rear seat center armrest
  • Sport steering wheel
  • Tachometer
  • Telescoping steering wheel
  • Tilt steering wheel
  • Extended Merino Leather Upholstery
  • Front Bucket Seats
  • Front Ventilated Seats
  • Heated Front Seats
  • Heated front seats
  • M Sport Seats
  • Power Front Seats
  • Power passenger seat
  • Split folding rear seat

Safety & Security

  • Driving Assistance Professional Package
  • Parking Assistance Package
  • Traction control
  • 4-Wheel Disc Brakes
  • ABS brakes
  • Dual front impact airbags
  • Dual front side impact airbags
  • Emergency communication system: BMW Assist eCall
  • Knee airbag
  • M Compound Brakes w/Red Calipers
  • Occupant sensing airbag
  • Overhead airbag
  • Brake assist
  • Electronic Stability Control
  • Panic alarm
  • Security system
  • Active Driving Assistant Pro
  • Extended Traffic Jam Assistant
  • Parking Assistant Plus
  • BMW Assist eCall

Other Features

  • harman/kardon Surround Sound System
  • SiriusXM w/360L
  • Air Conditioning
  • Automatic temperature control
  • Front dual zone A/C
  • Rear window defroster
  • Lumbar Support
  • Front anti-roll bar
  • Rear anti-roll bar
  • Speed control
  • Bumpers: body-color
  • M Shadowline Lights
  • BMW Curved Display w/HUD
  • BMW TeleServices
  • Carbon Fiber Trim
  • Compass
  • ConnectedDrive Services
  • Drive Recorder
  • Driver door bin
  • Front reading lights
  • Garage door transmitter
  • M Drive Professional
  • Outside temperature display
  • Overhead console
  • Personal eSIM 5G
  • Rear reading lights
  • SensaTec Dashboard
  • Trip computer
  • Front Center Armrest
  • Passenger door bin

Exterior & Mechanical

  • Adaptive suspension
  • Four wheel independent suspension
  • Low tire pressure warning
  • Auto High-beam Headlights
  • Delay-off headlights
  • Fully automatic headlights
  • Auto-dimming door mirrors
  • Icon Adaptive LED Headlights w/Laserlight
  • Spoiler
  • Turn signal indicator mirrors
  • Auto-dimming Rear-View mirror
  • Driver vanity mirror
  • Passenger vanity mirror
  • Alloy wheels
  • Wheels: 19" x 9.5" Fr/20" x 10.5" Rr (Style 826M)
  • Wheels: 19" x 9.5" Fr/20" x 10.5" Rr Silver
  • Rain sensing wipers
  • Speed-Sensitive Wipers
  • Variably intermittent wipers