2024 BMW M4
Phone Number: 331-267-6216
Odometer: 51,077 mlSPECIFICATIONS OF THIS BMW M4
- PRICE:$57,188
- BODY STYLE:2D Coupe / Coupe
- ODOMETER:51,077 MI
- ENGINE:V6 3L
- TRANSMISSION:6-Speed Manual
- TRIM:Base
- DRIVE TRAIN:RWD
- FUEL TYPE:Gasoline
- COLOR:Tanzanite Blue II Metallic
- DOORS:2
- MPG CITY:16
Description of BMW M4
This stunning 2024 BMW M4 Base delivers thrilling performance wrapped in timeless design. With its iconic blue exterior and aggressive M styling, this sports sedan commands attention on every road. Engineered for drivers who demand precision, power, and prestige, this M4 is ready to elevate your driving experience.Key Features:- 3.0L Twin-Turbocharged I6 Engine with 473 hp- 6-Speed Manual Transmission for engaging drive dynamics- 19" and 20" Style 826M Wheels- Icon Adaptive LED Headlights with Laserlight technology- Carbon Fiber Trim accents- M Shadowline Lights for distinctive appearance- Parking Assistance Package for convenience- Executive Package with premium amenities- harman/kardon Surround Sound System with 16 speakers- Apple CarPlay and Android Auto compatibilityThis M4 features premium Extended Merino leather upholstery throughout, heated and power-adjustable M Sport seats, and a heated steering wheel for maximum comfort. The intuitive BMW Curved Display with Head-Up Display keeps essential information at your fingertips, while ConnectedDrive Services and navigation enhance every journey. Advanced safety systems including dual front airbags, side airbags, knee airbags, and M Compound brakes with black calipers provide confidence and control.Experience the perfect balance of luxury and performance. Schedule your exclusive VIP test drive today and discover what makes the M4 the ultimate expression of BMW engineering.As Chicagolands oldest BMW dealership, we're honored to serve customers across Elmhurst and surrounding suburbs such as Oak Brook, Butterfield, Wheaton, Glen Ellyn, Lombard, Villa Park, Glendale Heights, Carol Stream, Bloomingdale, Medinah, Roselle, Itasca, Addison,Call us today at [phone] to schedule your exclusive VIP test drive and discover the quality, value, and confidence that come with driving one of our exceptional pre-owned vehicles.Dealer not responsible for typographical errors. Pictures are for illustration purposes only and may not represent the actual vehicle. All vehicles are subject to prior sale. See dealer for complete details. Pre-owned vehicle pricing excludes tax, title, license, and a $377.63 doc fee. Optional $199 Nitrogen Tires, and $1,995 First Place Finish. Vehicle availability, equipment, features, mileage, and condition may vary.




































